What should be in a pre-construction information pack?

What should go into Pre-construction Information?

  • Anticipated dates (planned start and finishing dates of the construction phase)
  • Details of Client, Principal Designer, Designers, and other consultants.
  • Extent and location of existing records and plans.

What are pre-construction documents?

Pre-construction document and cost analysis is a detailed analysis of the project’s budget estimate, the schedule of values, the construction team, the scope of work, the owner/contractor agreement, the plans and specifications, timeline, and materials in order to determine its constructability.

What should be included in a construction phase plan?

What does a construction phase plan include?

  • A project description. This should cover the scope of work and important dates and deadlines.
  • Management of the work.
  • Arrangements for controlling significant site risks.
  • The health and safety file.
  • Significant design and construction hazards.

What are pre-construction activities?

Typically, the pre-construction phase includes creating a strategic plan for the project, creating a design, securing permits or entitlements, and gathering the labor and resources required for construction.

What is a pre-construction information plan?

The Pre Construction Information Pack (PCIP) is a document which provides the information already in the Client’s possession, or which is reasonably obtainable, to relevant CDM Duty Holders, such as Designer(s), Contractor or Principcal Contractor.

Do surveys fall under CDM?

Going back to where site investigations are in the definition of construction work under CDM… Notice how site clearance, exploration and investigations ARE included, but site surveys are NOT included. You need to determine if you are doing a site survey or an investigation.

What is the meaning of pre-construction?

Definition of ‘preconstruction’ 1. construction in advance. adjective. 2. existing, occurring or carried out prior to construction; of or pertaining to the period or state of affairs preceding construction.

Who is involved in pre-construction?

Contractors have duties at the pre-construction phase. And the pre-construction phase is when the principal designer and the principal contractor are appointed. In fact, you can’t skimp on the pre-construction phase.

What is a construction phase plan HSE?

A Construction Phase Plan is a key document that details the health and safety risks associated with the construction phase of the project and the control measures that will be implemented to minimise risks or where possible, eliminate them.

What are the five phases of construction?

The five phases of the construction project lifecycle are: Project Initiation and Conception….

  • Project Initiation and Conception.
  • Project Planning and Definition.
  • Project Execution and Launch.
  • Project Performance.
  • Project Close.

What are the 3 stages of construction?

It’s important to understand the details of the process. The three phases followed are the Design Phase, Construction Phase, and Post-Construction Phase. Design Phase – A projects begins with figuring out the scale of work, which determines project cost and provides enough information to give a beginning estimate.

Which of the following tasks is usually done during pre-construction?

The Pre-Construction phase includes 1) developing a plan for the project, 2) creating a design for the project, 3) securing land/entitlements/permits and 4) procuring the team, financing, materials and labor required for construction to begin.

When to add pre construction information to a design?

Designer must then take account of the pre-construction information when preparing or modifying designs . Pre-construction information may be added to as the project progresses, and should be provided as appropriate to designers and contractors throughout the project before work starts on any particular element .

What should be included in a construction plan?

Pre-construction information and any key design information, identifying risks that need to be managed during construction work, will be helpful in planning the construction phase and drawing up the construction phase plan. Gathering as much health and safety information about the project and the proposed site before work begins is important.

When to hire a principal contractor for construction?

The principal contractor should be appointed by the client early enough in the pre-construction phase to allow them to work closely with the client, and in any event before the construction phase begins.