What is Stage 4a Riba?

Stage 4a: Concept design (design by consultant team). Stage 5b: Detailed design (design by contractor). Stage 6: Production information. Stage 7: Mobilisation. Stage 8: Construction.

How many stages are in riba?

eight stages
The RIBA Plan of Work organises the process of briefing, designing, delivering, maintaining, operating and using a building into eight stages.

What is a Stage 3 design?

Project Process Map. The design drawings and outline specification will be developed in consideration of the proposed phasing of works (if any) and the buildability strategy for the project.

What happens in Stage 0 of riba?

‘Strategic definition’ is a stage referred to in the RIBA Plan of Work. The 2020 Edition of the Plan of Work suggest that ‘Stage 0 is not about design or the practical details. It focuses on making the right strategic decisions and capturing them in a Business Case.

What is the correct order of the RIBA design process?

1 – Preparation and briefing. 2 – Concept design. 3 – Spatial coordination. 4 – Technical design.

What is a RIBA Stage 3 report?

The RIBA Plan of Work published by the RIBA in 2020 defines a stage report as: ‘A report produced at the end of Stage 2 (concept design) and Stage 3 (spatial coordination) to capture decision making during the stage and record the outcome of the design process as reviewed by the client.

What are the stages of the RIBA Plan of work?

The RIBA plan of work was revised in 2013 and comprises of eight separate work stages that each address a required phase of a construction projects progression, from inception through to completion. Each stage has clear tasks and outputs, which offer as both a process map and a management tool.

When was the DFMA overlay on the RIBA Plan of work?

The DfMA Overlay to the RIBA Plan of Work was published in 2016 and sponsored by leading contractors and clients through the Offsite Management School, set up to help supply chains embrace offsite manufacturing.

What happens at the end of the RIBA tender stage?

At the end of this stage, traditionally the project will be issued to the chosen group of contractors/builders for tender (normally a four to six week period). Once the tenders are received, the quotations will be assessed and analysed before one is chosen ready to start the construction work stage.

Which is the reference source for RIBA NRM 1?

RIBA & OGC Gateway process In order to maintain consistency with NRM 1,the RIBA Plan ofWork (2007) and the OGC Gateway have been used as the reference source in this document.InApril 2013 the RIBA launched a new plan of work.In addition,the Construction Industry Council (CIC) are planning a Digital Plan ofWork in 2014.