Does PlaniPatch need primer?

MAPEI’s Planipatch can be applied directly over clean, exterior-grade plywood. No additive or primer is required.

How long does it take for PlaniPatch to dry?

60 minutes
Allow at least 60 minutes to dry; thicker applications may require longer drying times before the application of flooring adhesives. Clean tools and equipment with water while product is still wet/fresh.

Can I use PlaniPatch over wood?

PlaniPatch works with concrete, wood substrates, ceramic tile, and other types of floor covering. The pot life is generally 8-10 minutes, so you’ll want to do all your prep well in advance of mixing up PlaniPatch. MAPEI Quickpatch is designed to use over concrete.

Can you use Mapei PlaniPatch on plywood?

Well, the answer is actually no. Mortars cannot be used to level or patch a floor – ever! The most versatile self-leveler is Novoplan 2 Plus, a high-strength, cement-based underlayment and repair mix for use over interior concrete, plywood and other approved floor surfaces.

Does Mapei self leveler need primer?

Suitable substrates include MAPEI epoxy moisture barriers, tile, terrazzo and sandblasted steel decking. Porous substrates like concrete will still require a primer to prevent pinholes and aid in flow of the leveler.

Can you paint Planipatch?

When Planipatch is mixed with water, it becomes a thixotropic paste which may be easily applied, has high bonding strength with the substrate and dries so quickly that successive painting or the laying of flooring or ceramic coverings may be carried out after only 4 to 6 hours of it being applied.

Can you paint over Planipatch?

Is Mapei Planipatch self leveling?

MAPEI now offers a self-leveling underlayment that streamlines the installation, and doesn’t compromise on bond, durability or the smoothness of its surface. Work smarter, not harder… right?

Can Planipatch be painted?

Can you put a second coat of self-leveling compound?

Can You Put A Second Coat Of Self-Leveling Concrete Down? Yes, it is possible to lay a second layer of self-leveling concrete once the first layer is fully set and dry. Primer should be used before pouring just like with any concrete floor. It is best to wait 24 hours.

Can Portland cement be used as floor leveler?

Portland self leveling cement is a type of pourable cement that is primarily used in the preparation of interior floors as an underlayment to support new floor covering installations. It’s easy to use, and an excellent way to fix cracked, uneven or out-of-level floors with minimal effort.

Can you pour self-leveling concrete over plywood?

If you’ve got a plywood subfloor, like many buildings do, you can leave it in place and apply self-leveling concrete directly on top of it. You can also use self-leveling concrete on plywood as an underlayment for other types of floor coverings, such as carpet or tile.